Here are just a few of our recent Clients & Projects in which we were able to implement our services.  Many of our projects involve T. Luckey utilizing our experience to quickly and efficiently solve the most difficult geotechnical challenges.  Services featured include underpinning, roadway slab lifting, stone quarry water control, chemical grouting, and many more.

White House Restoration

Groundwater infiltrating the basement of the White House Press Briefing Room was causing serious problems during recent renovations. The majority of the groundwater infiltration was coming in through the original stone...

  • Main
  • Home
link

Saint Regis Restoration

Located two blocks from the White House in Washington D.C. is the famous Saint Regis Hotel. The Saint Regis Hotel is considered one of the best hotels in the world and caters to many...

  • Main
  • Home
link

Barren River Project

A new intake structure being built required a cofferdam to be constructed out into the Barren River. Once completed, the cofferdam would be dewatered and excavated down to proper grade elevation. Early into the excavation...

  • Main
  • Home
link

University of Cincinnati Groundwater

During construction of a new power generating plant for the University of Cincinnati old abandoned fuel tanks were found buried in sand. During the excavation of the tanks it was discovered that the surrounding sand fill...

  • Main
  • Home
link

Open Pit Quarry

A small river located approximately 1/4 mile away begin leaking water into an open pit quarry through rock fractures in the river bottom. The leaks grew as water eroded away the mud seems and eventually the entire river flow was...

  • Main
  • Home
link

Bischoff Restoration

Shortly after its original construction in 1960, the Bischoff Reservoir began to experience a small amount of leakage through limestone formations. The leak was evident near the toe of the dam and was estimated to be approximately...

  • Main
  • Home